Load Testing

Tips for selecting appropriate tools

Tips for speeding-up the load testing process Two ways - 1) move final test to earlier date; 2) minimize work amount - these can conflict. What cannot give sophisticated results and takes more time to analyze results Areas where problems usually appear when creating load test scripts (possibly break out tool-specific problems)


CategoryTesting


EditText of this page (last edited September 8, 2003) or FindPage with title or text search